claude-handoff
MAmattpocock/skills288k10,178 new stars in the last 7 days
Deliver scoped repository changes or technical decisions with verification evidence. Product discovery, disposable prototypes, product acceptance design, and repository operations belong to their respective capabilities.
For a scoped change, the workflow below is sufficient without phase-by-phase reference reads. Follow the repository's rules where they require more.
When the task specifies a finite set of input files and output paths, with no code or repository-behavior change, read all supplied inputs in tool-sized batches, grouping independent reads where possible. Write the deliverable, read it back once for focused verification, and finish. Skip generic repository discovery, Git/branch/baseline/diff checks, manifest/CI inspection, and unspecified files. Do not create a plan merely to narrate finite batches; reserve it for real dependencies, cross-boundary work, or high-risk decisions. Input coverage, output verification, and safety boundaries still apply.
Read a reference only when its additional procedure resolves a current uncertainty or covers the risk below. These guides are not prerequisites for ordinary edits, tests, or final diff review; do not load the whole directory.
| Need beyond the core workflow | Reference |
|---|---|
| Unfamiliar repository with unclear instructions, entry points, or affected modules | Repository intake |
| Significant architecture choice or an ADR deliverable | Architecture decision |
| Time-boxed feasibility investigation or POC recommendation | Technical spike |
| Challenge a technical plan or resolve competing decision branches | Decision review |
| A requested structured plan or multi-stage development handoff | Development template |
| Dependent implementation slices needing an explicit feedback and evidence sequence | Implementation |
| Unresolved cause, CI/runtime/environment failure, or performance investigation | Debugging |
| Integration, contract, E2E, UI, or performance evidence requiring test-layer design | Engineering tests |
| Dedicated review or high-risk change needing the expanded review checklist | Review and finish |
MAmattpocock/skills288k10,178 new stars in the last 7 days
AFaffaan-m/ECC278k4,046 new stars in the last 7 days
AFaffaan-m/ECC278k4,046 new stars in the last 7 days
AFaffaan-m/ECC278k4,046 new stars in the last 7 days
DIDietrichGebert/ponytail162k5,405 new stars in the last 7 days
Scan shortcut comments, build a debt ledger, flag items without an upgrade path.
DIDietrichGebert/ponytail162k5,405 new stars in the last 7 days